- October 2004- present: Working as a technical advisor to the QualSys Engco, consulting company (Kitchener, Ontario, Canada) for power system related problems.
- March 2002- September 2003: Working with a consulting group (Ian Martin Ltd., Toronto, Canada) to study flickers in distribution system.
- April 2001- September 2001: Working with a consulting group (Ian Martin Ltd., Toronto, Canada) to mitigate power disturbances in distribution system.
- April 2000- Sept. 2000: Working with a consulting group (Ian Martin Ltd., Toronto, Canada) to reduce power disturbances in distribution system.
- April 1999- Sept. 1999: Consultant: Load modeling for distribution system harmonics study, Royal Military College, Kingston, Canada.
- Feb. 1998 - Sept. 1998: Consultant: Power quality analysis, Royal Military College, Kingston, Canada.
- January 1998- May 1998: Consultant: Study the electric network for Aswan Airport, Sarah Engineering, Waterloo, Ontario, Canada
- April 1996 - March1997: Consultant: Power Quality assessments in Commercial building, Royal Military College, Kingston, Ontario, Canada.
- May 1995- September 1997: Developed a comprehensive software for substation grounding system, SIMFIELD Comp., Waterloo, Ontario, Canada.
- Sept. 1994 - June 1995: Consultant: Evaluation of the new reluctance motor design for Polestar-Magnetronics Inc., Kitchener, and Ontario, Canada.
- Aug. 1992 - March 1995: Working with a consulting group (Ian Martin Ltd., Toronto, Canada) to reduce zero sequence harmonics in distribution system.
- Jan. 1990 - Aug. 1991: I worked with a consulting group (based at Royal Military College, Canada) to reduce voltage spikes in the power distribution system of a Canadian Navy ship, Department of National Defense, Ottawa, Canada.
- Sept. 1984 - Aug. 1990: I worked as a consultant with the Ministry of Electricity (Medium and Low Voltage Networks) to improve distribution system performance, Cairo, Egypt.
- Jan. 1990 - July 1990: I designed the exterior lighting system for Cairo main train station, Ministry of Transportation, Cairo, Egypt.
- May 1989- July 1990: I was the Regional Electrical Consultant for Helnan Hotels, Denmark.
- April 1989 - June 1990: I designed the up-graded electric power network for Etab-Hotel in Port-Saied, (600 rooms), Port-Saied, Egypt.
- Jan. 1990 – March 1990: I designed and supervised the installation of the acoustic and lighting systems for the Cleopatra Conference Hall (500 seats), at Shepherd’s Hotel in Cairo, Cairo, Egypt.
- Feb. 1990 – June 1990: I designed and supervised the installation of the upgraded fire alarm system for Shepherd’s Hotel in Cairo (900 rooms), Cairo, Egypt.
- May 1989 - July 1989: Consultant for Solarex Company, Los Angeles, California, for the project: solar driven radar stations based at Cairo, Egypt.
- Feb 1989 - July 1989: I designed and supervised the installation of the new electric power network for Shepherd’s Hotel in Cairo, 5 MVA, Cairo, Egypt.
- June 1989 – July 1989: I designed the power factor correction system (Switched Capacitor Banks) for the electric power network for Shepherd’s Hotel in Cairo, 5 MVA, and Cairo, Egypt.
- May 1987 - Feb. 1987: I designed and supervised the installation of the electric power network and standby power station (4 MVA) for The Royal Diamond Crystal Factory, Cairo, Egypt.
- April 1987 - Dec. 1987: I designed and supervised the installation of the electric power network and standby power station (1.5 MVA) for The Polystyrene Factory, Cairo, Egypt.
- March 1987 - May 1987: I designed and supervised the installation of the electric power network and standby power station (2.5MVA) for Assfour Glass Factory, Cairo, Egypt.
- April 1986 - Jan. 1987: I worked as a consultant with El-Madina Co. to design the electric power network and the standby power station for the National Telecommunication Computer Center, Ministry of Transportation, Cairo, Egypt.
- Feb. 1985 - May 1985: I designed the grounding system network for the 15 laboratories of Technical Military College of Egypt, Cairo, Egypt.
- Jan. 1982 - Aug. 1982: I designed the upgraded electric power network for the Faculty of Engineering, Ain Shams University, Cairo, Egypt.
- Summer 1980: I worked as a consultant for Trench Electric Ltd., Toronto, Ontario to develop practical techniques to reduce the electrical tracking on the insulators’ outer surfaces for some T-E outdoor products.
- May 1978 - July 1978: I designed the interior lighting design for the Religion Institute Complex, El-Madina, Saudi-Arabia.
- March 1978 - July 1978: I designed the electrical power network and the standby power station (2MVA) for the Religion Institute Complex, El-Madina, Saudi-Arabia.
- Sept. 1978 - Nov. 1978: I designed the electric power network for Shaker Hospital for Kidney Diseases, Cairo, Egypt.
- July 1978 - May 1980, October. 1980 - Aug. 1982: I worked as a consultant for Rural Electrification Authority of Egypt (REA) to develop new techniques for reactive power control on distribution feeders for maximum loss reduction.
- April 1977 - June 1978: I worked as an Electrical Engineer for Trench Electric Ltd., Toronto, Canada. I was charged with the following projects:
- Development of a new design of a large air core power reactor for high voltage withstands capabilities.
- Design of a grounding system for polymer enclosures for polymer enclosures for high voltage equipment.
- System analysis for transient overvoltages due to the insertion of a capacitor-reactor bank in the electric power network.